Tuesday, 28 January 2014

Assembly Line Balancing

Manufacturing Operations Management 1 Yoke Flange Layout Assignment, army Line Balancing To decide which machines are to be scrapped consideration maintaining enough capacitance to meet demand a development called assembly pedigree balancing is to be used. Here the expertness of each lay is calculated and compared with the required capacitance and the capacity of the other postal services to devise a antecedent that both(prenominal) meets requirements and minimises idle time.          To analyse the current set up a spreadsheet showing the capacity of each carry was produced. To allow for swarthy machinery and alimony time an efficiency rate and support permissiveness were deducted. station         weekly time         time allowance for maintenance         Number of machines         efficiency rate         Units per mc/hour         units produced 10          75         1         4         0.98         13         3771 20 (Ryder)         75         2         4         0.95         6         1664 20(Wickman)         75         2         4         0.98         6         1716 20 (total)                                                      3380 30 (new)         75         1         3         0.98         12         2610 30 (worn)         75         1         3         0.85         12         2264 30 (total)                                                   !     4874 40         75         1         2         0.98         29         4206 50 (Detroit)         75         3         1         0.98         60         4233 50 (Cincinnati)         75         1         4         0.6         9         1598 50 (total)                                                      5831 60         75         0.5         2         0.95         19         2689 70         75         0.25         4         0.95         19         5396         The future capacity of the line was pr edicted at 2800 units per week. about stations were over capacity, so had the possibility of removing machines. rank 60 was under capacity so duplicate hours of extra time would flip to be added.         Machines were then removed so each station would meet capacity with the minimum form of machines. Also an overtime allowance was added for station 60. To avoid problems with station 60 not producing enough work for station 70 the capacity of station 70 was reduced in line with station 60 and given the same overtime hours. In... If you destiny to get a full essay, order it on our website: OrderCustomPaper.com

If you want to get a full essay, visit our page: write my paper

No comments:

Post a Comment